Title
West Inter-Lake (WILD) Water Commission - Request to Fund Waterline Oversizing
Proposed Motion(s)
That Council approve up to $250,000 from the Long Term Sustainability Restricted Surplus to fund the engineering and construction costs to increase the West Inter-Lake (WILD) Water Commission transmission pipeline capacity from the Capital Region Parkland Water Services Commission access point to the West Inter-Lake (WILD) Water Commission proposed pumping station located within SE 12-53-28-W4M.
Body
Administration Recommendation(s)
Administration supports the proposed motion.
Purpose
To provide approval for the construction and financial support required to carry out work associated with increasing the capacity of the WILD Water Commission water transmission pipeline.
Summary
The Wild Water transmission line is designed to transport potable water from the Capital Region Parkland Water Services Commission to the member municipalities represented within the West Inter-Lake (WILD) Water Commission. Each member municipality has a specified volume of water allocated to their municipality. Parkland County's allocation was based on serving residential development within a set area along the water pipeline alignment.
Considering the potential commercial, industrial and residential development within the 5th Meridian area, Parkland County has an opportunity prior to construction to increase the water transmission line capacity to serve this area without impacting our current allocation.
The WILD Water Commission’s engineering consult (DCL Siemens Engineering Ltd.) has performed water modeling calculations to determine what size of pipeline is required to serve the 5th Meridian Area as defined in the attached Associated Engineering 5th Meridian Area Servicing Report. Based on their calculations and cost estimates, Parkland County can oversize the water transmission pipeline to serve the 5th Meridian Area for approximately $236,000 without affecting the current ...
Click here for full text