File #: RFD 18-002    Version: 1 Name: Range Road 55, Township Road 511 to Township Road 511A – Budget Approval Request
Type: Request For Decision Status: Carried
File created: 12/14/2017 In control: Infrastructure Services Division
On agenda: 1/9/2018 Final action: 1/9/2018
Title: Range Road 55, Township Road 511 to Township Road 511A - Budget Approval Request Proposed Motion That Council approve an additional $555,000 of Gas Tax Funding, to a total upset limit of $842,500, for erosion control work along Range Road 55 between Township Road 511 and Township Road 511A.
Attachments: 1. Site Location Plan, 2. Design Plan
Title
Range Road 55, Township Road 511 to Township Road 511A - Budget Approval Request

Proposed Motion
That Council approve an additional $555,000 of Gas Tax Funding, to a total upset limit of $842,500, for erosion control work along Range Road 55 between Township Road 511 and Township Road 511A.
Body
Administration Recommendation
Administration supports the proposed motion.
Purpose
Additional funding is required prior to tendering Range Road 55, Township Road 511 to Township Road 511A.
Summary
A meander bend on Tomahawk Creek is encroaching on the road embankment of Range Road 55, resulting in bank erosion and significant sloughing of the road embankment. The slope failure has created hazardous conditions for vehicular traffic and requires an engineered solution to repair the bank and prevent further failure.
In 2016 Administration requested a budget of $287,500 to design and construct a solution to the bank erosion. The intent of this money was for a simple-short term fix to the issue, having minimal construction footprint and impact to Tomahawk Creek and a resolution that required a minimal amount of time and money. Early investigation into the proposed project identified the challenges would require a higher degree of effort to permanently resolve the concern.
Money was carried over to the 2017 budget to fully investigate the issue and in April 2017, Parkland County contracted Matrix Solutions Inc. to review several solutions to solve the creek erosion. The most preferred option was to realign Tomahawk Creek, by excavating a new channel through an oxbow, to remove the geo-hazard from Range Road 55 permanently. This option was selected as it was the long term solution and would allow the Range Road 55 side slope to be reconstructed to Parkland County’s current Engineering Design Standards.
The creek realignment option involves creating a short section of new creek bed that mimics the characteristics of a natural creek. This solution carries additional en...